Insights

BICS

What evidence do you need to apply for BICS?

Find out what evidence you need to apply for BICS, from electricity bills and production records to shared meter, private wire and Supercharger requirements.

Millie Palmer

A British Industrial Competitiveness Scheme (BICS) application is decided on the evidence you submit, and nothing can be amended once you've sent it. That makes the evidence list the most useful document to read before you open the online service. What you need depends on how you buy electricity, whether you share a meter, and whether your site makes a mix of eligible and ineligible products.

Applications close on 30 November 2026, and some of this evidence takes time to collect, so it's worth starting now.

The evidence at a glance

You'll need the following information to demonstrate that you qualify:

  • Business identity: Companies House number, registered business name, and where relevant a statement on which SIC code applies to your business
  • Applicant details: Name, contact address, email address and GOV.UK One Login account, plus confirmation that you're authorised to act for the business
  • Manufacturing site: The site address and a statement on what is on the site, including eligible and ineligible activities
  • Grid electricity supply: Bills for the most recent six consecutive months available, within the last 12 months, showing supply address, MPAN, meter address, supplier, billing period and bill payer
  • Electricity consumption: The same bills, showing the amount of grid electricity used
  • Eligible manufacturing: Statements on your SIC code, your products and their HS codes, any ineligible production, and a summary of the production process, plus six months of production records
  • Mixed eligible and ineligible activity: A statement setting out how you calculated your pro-rating tier, and sub-metering data if you have it
  • Shared meter or landlord arrangements: A lease, supply agreement, invoices or correspondence showing how electricity is allocated
  • Private wire supply: Confirmation from your supplier that you pay the Renewables Obligation, Capacity Market and Feed-in Tariff levies
  • British Industry Supercharger support: A copy of your EII certificate, the product codes it covers at each meter, and a declaration that the consumption claimed under BICS is separate
  • Declaration: Confirmation from an authorised officer or agent that the information is accurate and complete

The six-month rule for evidence

Both your electricity and your production evidence must cover the most recent six consecutive months for which information is available, within the 12 months before you apply. Bills are the starting point, because they prove the MPAN, the supply address and the volume of grid electricity you used.

If you don't pay the grid supplier directly, you'll need the bill you pay to the third party for those six months. Where that bill doesn't show how much grid electricity you used, an invoice from your landlord should confirm it, along with the MPANs it relates to.

Proving that you manufacture eligible products

This is the part of the application that most often needs extra work. You'll need to show that eligible production is taking place at the site, and the accepted records are:

  • Enterprise Resource Planning records, such as production orders that were issued and completed
  • Production logs showing what was made, when and in what quantities
  • Quality control records linked to production batches

Sales and purchase records are not accepted, because they don't show that anything was manufactured. Whichever records you use, they should be aggregated to a monthly level and show how eligible production relates to total production on the site.

If you export, customs records showing the HS classification of your products can be added, but there's no requirement to export, so you can forego them.

What your statements need to say

Your written statements go into free-text boxes limited to 350 words, and they do a lot of the work. They should refer to an eligible SIC code and describe your products against the relevant HS code. They should also say whether any ineligible production takes place, and summarise how you make your products. Supporting documents can be uploaded as PDFs, Word documents, Excel spreadsheets, ERP exports or scans.

Keep the language specific. A statement that names the machines, processes and products at your site is far easier to check than a general description of your industry.

What evidence do you need when your site is not straightforward?

BICS relief is calculated for each manufacturing site. A site that makes only eligible products, with no ineligible activity, receives a 100% exemption, subject to verification. But where eligible and ineligible activity share a site, a meter or a Supercharger certificate, the exemption is apportioned, and your evidence has to show the working.

Mixed eligible and ineligible activity

The starting point is the total grid electricity your site used over the 6-month evidence period. You then work out how much of that grid electricity was used for eligible manufacturing, including the supporting activities that make it possible (lighting, compressed air, cooling, quality control, material handling and on-site offices, for example). The resulting percentage places you in one of 3 tiers:

  • 25% or less of your grid electricity used for eligible manufacturing: 0% exemption
  • More than 25% but less than 50%: 50% exemption
  • 50% or more: 100% exemption

Shared supporting activities follow the same banding. If 25% or less of a shared system's electricity supports eligible production, none of it counts; if the share is more than 25% but less than 50%, half counts; at 50% or more, all of it counts.

Your statement should set out the methodology, use the same 6 months throughout, and show the arithmetic. If you have sub-metering or other electricity monitoring (energy management platforms and machine-mounted sensors count, not just traditional sub-meters), you provide monthly totals and are expected to use that data in the calculation. If you don't, you can estimate from equipment ratings, operating hours or production data. Underlying evidence for estimates isn't required at the application stage, but it may be requested in post-application checks.

Here is what that looks like in practice:

Company A used 1,000 MWh of grid electricity over 6 months. Its eligible production line used 350 MWh and its ineligible line used 300 MWh.

Shared supporting systems used 250 MWh, of which 40% served eligible production, so half (125 MWh) counts.

A further 100 MWh related to third-party warehousing and is excluded.

Eligible electricity is 350 + 125 = 475 MWh, or 47.5%, which places Company A in the 50% tier.

That example sits just below the 100% threshold. It shows why the split of shared systems deserves care, because a modest change in how they are apportioned can move a site into a different tier.

Shared meter or landlord arrangements

If you don't pay the grid supplier directly, or you share a meter, only your own share of the meter counts. You need at least one document showing the arrangement, such as a lease, an energy supply agreement, a recharge agreement, landlord invoices, an intercompany cost allocation or correspondence explaining it. It should show the site address, the parties, the period covered and how electricity is allocated to tenants. You also need evidence of the total consumption recorded by the whole meter.

The exemption is then applied to your share only. If you use 40% of a shared meter and fall in the 50% tier, the exemption applied to the meter is 20% (50% × 40%). Two practical points are worth noting. Responsibility for gathering this evidence sits with the applicant, and the Department cannot compel a landlord to pass the benefit through. And if everyone on the meter uses a different 6-month period, combined shares can exceed 100%, which allows the Department to revise the meter share. Agreeing a common period with your landlord and the other occupiers avoids that. Electricity used by machinery or infrastructure shared with another party is not eligible.

Private wire supply

Private wire sites can apply, but your supplier has to confirm that your arrangement is in scope. You'll need a statement from the supplier, plus a bill (or an alternative) covering 6 months that shows you pay the Renewables Obligation, Capacity Market and Feed-in Tariff levies. In practice, the arrangement must connect to the distribution network, with metering and settlement in place that makes those levies visible. Arrangements that connect through a generator import meter are not eligible in the first year, and any exemption is conditional on settlement bodies being able to verify the levies. Contact your supplier early, as this is the evidence you can least control.

British Industry Supercharger support

A site can hold both a Supercharger exemption and a BICS application, but the same electricity cannot be relieved twice. You'll provide a copy of your EII certificate, the percentage of each MPAN it covers, the Prodcom codes it relates to at each meter, and a declaration that the consumption claimed under BICS is separate. BICS then applies only to the part of the meter not already covered. If an MPAN has a 70% Supercharger exemption and earns a 100% BICS exemption, BICS applies to the remaining 30%. The pro-rating calculation also excludes the Supercharger-covered electricity from the denominator.

Key takeaways

  • Start with your bills. Six consecutive months, within the last 12, showing the MPAN and supply address.
  • Use production records, not sales records. ERP records, production logs and quality control records are accepted.
  • Match the evidence to your set-up. Shared meters, landlords, private wires and Supercharger support each have their own requirements.
  • Allow time to check. Nothing can be changed after submission.

The businesses that find this part manageable haven't got simpler operations. They've simply collected the evidence in one place before starting the form. If you'd like help working out what your site needs to provide, speak to the Energy Relief Vault team and they'll walk you through it.